We have started the cladding of the house. Although we still have, is very exciting to see every day materialize the project, as you can see where are the doors, windows, etc.. If all goes as planned next week will begin with interior partitions.
The wall structure has changed from the original idea. Finally pondremo s solid brick walls, multi-pack, organic hemp insulation , termoarcilla tube and 14 cm. As we are using mortar Bi oCalce Wall
of Kerakoll is an eco-compatible mortar of lime pure natural NHL 3.5. The Wall s are being built from the inside outwards, so that l late s part to build was the outside of termoarcilla. For this r tendon AN who install scaffolding around the house, where will the isolation and termoarcilla. This allows us to put air into the chamber to the outside insulation and inward, as shown in the picture. This structure enables to optimize the performance of l a camera to ire and isolation. The air temperature buffering acts extr and more from outside, if s and install sticking to the inner wall, and insulation co n touch with the outside, the air chamber loses much of its usefulness d, as happens in most homes. It is very important that the camera no more than 3 or 4 cm, so that there is no mo movements of
conv ection is inside, and he would also lose its insulating capacity. -----------
conv ection is inside, and he would also lose its insulating capacity. ----------- The masonry work being done CONSTRUCTION CRISA by CB, a company that has done restoration work and know how to build with lime mortar and plaster. They are also interested in building energy efficient housing and since I knew our project have shown great interest and involvement. ------------
cteriza by its low thermal conductivity (0.041 W / mk) and being a natural material and renewable. In future entries discuss in depth the options available brick and insulated.